Cincinnati, Ohio
Client: Village of Evendale
Design Engineer: Sustainable Streams
Completed: 2018
As the General Contractor, ERC completed the stream restoration of Mill Creek in South Western Ohio. Our scope of work included the construction of one (1) riffle, rock toe, buried grade control, grading, and complete site stream restoration. After mobilizing to the site ERC cleared and grubbed the entire site and then excavated 2,900 CY of soil. In order to align the stream and to slope the stream banks, ERC imported over 1,525 tons of rock including various riprap and native streambed material. The site was finished by planting trees and installing 574 live stakes.
Services
- Clearing & Grubbing
- Cut/Fill earthwork
- Import & placement of rip rap& native bed material
- Tree planting & live stakesSlope stabilization
- Seeding & strawing
- Erosion Control