ERC was hired as the General Contractor to perform repairs at 3 landfills in Tennessee for Johns Manville. The project consisted of replacing the leachate sprinkler systems, the leachate collection piping and lift stations, installing new landfill toe drains and re-capping large portions of the landfill. All waste encountered during the operation was either reappropriated into the landfill or hauled off for disposal. We hired and managed an electrical subcontractor to install a new electrical drop and install new power to the 3 landfills and their individual controls.

Services

  • Utility locating, abandonment& relocation

  • Concrete pad construction

  • Installation of above groundleachate tanks

  • Lift station, pumps andcontrols

  • HDPE pipe welding andinstallation

  • Electrical drop and installation

  • Onsite borrow, placement andcompaction for the landfill cap

  • Clearing & Grubbing

  • Erosion Control

  • Seeding & Mulching