STREAM RESTORATION

Fetter’s Run, Lancaster, Ohio Client: City of Lancaster Design Engineer: Jobes Henderson & Associates Completed: 2017 As the Environmental General Contractor, Environmental Remediation Contractor restored Fetter’s Run Park in Lancaster, Ohio. This stream restoration project involved clearing & grubbing land adjacent to the stream. We did Demolition of an existing bike path & pavilion then…

EVENDALE COMMONS STREAM RESTORATION

Cincinnati, Ohio Client: Village of Evendale Design Engineer: Sustainable Streams Completed: 2018 As the General Contractor, ERC completed the stream restoration of Mill Creek in South Western Ohio. Our scope of work included the construction of one (1) riffle, rock toe, buried grade control, grading, and complete site stream restoration. After mobilizing to the site…

JOHNS MANVILLE COKER LANDFILL 1, 2 & 3 REPAIR

Athens, Tennessee Client:Johns Manville Design Engineer:AECOM & TetraTech Completed:2015 ERC was hired as the General Contractor to perform repairs at 3 landfills in Tennessee for Johns Manville. The project consisted of replacing the leachate sprinkler systems, the leachate collection piping and lift stations, installing new landfill toe drains and re-capping large portions of the landfill.…

STREAM, BANK STABILIZATION

Akron, Ohio Worked with engineers and landscaping firm to repair country club stream on holes 4 and 10 that were damaged by a volatile adjacent stream. We used matting to ensure the surrounding area was not damaged by our equipment as we excavated and widened the creek. Stream restoration, we rebuilt the channel and waterfall…

DAM REMOVAL, GOB FIRE

Coal Gob Fire Quenching – Wellston, Ohio Removal of a 100,000,000 gallon dead lake from a former coal mine in Southern Ohio. While working on removal of a dead lake we uncovered a burning gob fire. We moved 45,000 cubic yards of cut to fill and cut to waste, installed 36″ reinforced concrete pipe to…

LEAD AND ARSENIC REMOVAL

City of Cincinnati The Airport was built on a former military firing range and apple orchard. To complete the removal of all the lead and arsenic, we excavated and removed over 20,000 tons of treated and non-treated contaminated soil. Then we stabilized 11,000 tons of hazardous soil on site. We graded and capped the site…