Design build

design-buildClient: City of Lebanon, Ohio
Design Engineer: Burgess & Niple
Completed: 2019

Design build

 

The Environmental Remediation Contractor and Burgess & Niple team was selected as the design-build team to complete the design, permitting and construction work along Turtle Creek. The scope of work included the removal of a failing sheet pile wall, clearing, and grubbing, excavation/embankment, re-alignment of the stream, installation of instream structures and rip-rap slope protection. ERC encountered petroleum-impacted soils during the removal of the sheet pile wall and slope excavation. Once found, our trained and experienced crew efficiently remediated the impacted soil. This project is a prime example of the ERC Team’s ability to perform design-build services, bank stabilization, stream restoration, and remediation services on one project site.