Port Clinton, Ohio

Client: Cooper Tire Company

Design Engineer: Hull & Associates

Completed: 2016

ERC was hired as the General Contractor for this demolition and remediation project. We hired and managed several subcontractors for Demolition, Concrete Crushing, Surveying, Compaction Testing, Asbestos & Universal Waste. ERC self-performed the in-situ soil mixing, waste characterization & sampling, disposal, backfill import & placement, grading & restoration. The project had multiple constituents as waste streams including haz levels of TCE, Lead & Vinyl Chloride along with non-haz levels of TCE, Lead and other petroleum-based impacts. Over 10,000 tons of impacted soil was removed and disposed of.

Services

  • Utility locating, abandonment & relocation
  • Building & Pavement Demolition
  • Concrete Crushing
  • Hazardous & Non-hazardous oil excavation & disposal
  • Hazardous & Non-hazardous water treatment & disposal
  • Insitu soil treatment
  • Geoprobe characterization sampling & analysis
  • Offsite borrow import, placement, and compaction
  • Clearing & Grubbing
  • Erosion Control
  • Seeding & Mulching